Your inspector needs to see which masonry cells are being reinforced, what steel is installed, and how the reinforcement connects at the top and bottom where required by the approved structural plans.
Start with wide views so the inspector knows which wall and cells are being shown, then get close enough to clearly see the reinforcement and required connections.
Some cells are structural and require specific reinforcement and connections. Other cells may be infill and may not require the same ties. Follow the approved structural plans and make sure the inspector can identify each condition.
Whenever a dimension needs to be verified, include a clear photo with the measuring tape visible next to the reinforcement or connection.
Start with a slow video showing the wall and the cells that will be filled.
Make sure we can see:
Show the vertical reinforcing steel in the cells required by the approved structural plans.
Make sure we can see:
Do not send only one close-up of one bar. Show enough cells for the inspector to verify that the required reinforcement pattern is being followed.
Where required by the structural design, take photos from the top so the inspector can see how the vertical reinforcement connects into the structural element above.
This may include:
Show the full connection first, then take a closer photo so the inspector can clearly see how the reinforcing steel is tied together.
Where required, show how the vertical reinforcing steel connects to the footing, slab, dowel or other structural anchorage below.
Make sure we can see:
If the required connection was photographed earlier in construction, include those photos with the inspection if the connection is no longer visible.
Show any reinforcing steel laps, splices or other dimensional conditions that need to be compared with the structural plans.
Use a measuring tape in the photo whenever lap length, bar spacing or another dimension needs to be verified.
Make sure we can see:
Where cleanouts or inspection openings are required, make sure they remain visible and show the condition of the cells before grout is placed.
Make sure we can see:
If some cells have different reinforcement or connection requirements, show those conditions separately.
This may include:
Do not assume every filled cell requires the same reinforcement. Follow the approved structural design for each condition.
Take 30 seconds and make sure your inspector can clearly identify the reinforced cells and follow the steel from bottom to top where required.
Submit your photos, videos and measurement photos through Permit Rockstar. Your inspector will compare the fill-cell reinforcement and required connections with the approved structural plans.