Your inspector needs to see the water, drain and vent piping before walls, floors or ceilings cover the installation.
Start with a slow walkthrough so the inspector understands the layout, then get closer to piping, fixture rough-ins, supports, penetrations and test conditions.
Do not cover supply piping, drain and vent piping, fittings, penetrations or other rough plumbing work until the required inspection is complete.
Use a measuring tape for spacing, clearances, distances and other dimensions. Use a level when pipe slope or pitch needs to be verified. Make sure the measuring tool and the installation are both clearly visible in the photo or video.
Start with a slow walkthrough of all areas included in the inspection.
Make sure we can see:
Show representative hot and cold water piping throughout the project.
Make sure we can see:
Show the DWV piping throughout representative areas before it is concealed.
Make sure we can see:
If pipe slope or pitch needs to be verified, place a level on the pipe and take a clear photo or video showing the level and the piping together.
Show enough surrounding piping so the inspector can identify which run is being checked.
Show how the piping is supported and secured throughout representative areas.
Make sure we can see:
If support spacing needs to be verified, place a measuring tape between supports and take a clear photo.
Show the rough plumbing provided for the fixtures included in the project.
This may include:
If a rough-in location or dimension needs to be verified, include a measuring-tape photo.
Show where plumbing passes through framing, floors, walls or other building assemblies.
Make sure we can see:
If a test is required for the rough inspection, show the test setup and enough information for the inspector to review the condition.
This may include:
Keep the test in place for the inspection when required.
If part of the plumbing installation is different from the typical rough-in, make sure your inspector can clearly see it.
This may include:
Show the full area first so the inspector knows where it is, then take close-up photos of the condition.
Take 30 seconds and make sure your inspector can clearly see the rough plumbing installation before anything gets covered.
Submit your photos, videos, measurement photos, level evidence and test evidence through Permit Rockstar. Your inspector will compare the plumbing rough installation with the approved plans and applicable project requirements.