Show the underground electrical work included in your project before trenches, conduits, crossings and entry points are covered by backfill or concrete.
Start with wide views so the inspector can understand the complete route, then get closer to conduit, depth, bends, crossings, stub-ups and entry points.
Not every underground electrical installation includes the same service conduits, feeders, branch circuits, grounding components or utility crossings. Show the work that is actually included in your permitted scope.
Keep the conduit route, depth, bends, crossings, stub-ups and other underground conditions visible until the required inspection evidence is complete.
Use a measuring tape for trench depth, conduit cover, spacing, separation, clearances and other dimensions. Make sure the tape and the condition being measured are both clearly visible.
Start with a slow video showing the complete underground electrical installation included in the inspection.
Make sure we can see:
Take clear photos of representative conduit and connections before the installation is covered.
Make sure we can see:
Where depth or cover needs to be verified, show a clear measurement before the trench is backfilled.
Place the measuring tape so the inspector can clearly see the depth from the applicable reference point to the conduit.
Make sure we can see:
Show representative measurements where the route or depth changes.
Show areas where the conduit changes direction or transitions vertically into equipment or the building.
Make sure we can see:
Show where the underground conduit enters the building, equipment, panel area or other destination.
This may include:
Show enough surrounding area so the inspector can identify where each stub-up or entry point is located.
If the electrical route is near or crosses other underground utilities or systems, show those conditions clearly.
This may include:
If separation or clearance needs to be verified, place a measuring tape between the systems and take a clear photo.
If grounding or bonding components are part of this underground installation, show them before they are concealed.
This may include:
Show the overall location first, then take close-up photos of the actual connection.
If part of the underground electrical installation is different from the typical route, make sure your inspector can clearly see it before the work is covered.
This may include:
Show the full area first so the inspector knows where it is, then take close-up photos of the condition.
Only check the items that apply to your permitted electrical scope.
Submit the photos, videos and measurement evidence for the underground electrical work that applies to your project through Permit Rockstar. Your inspector will compare the installation with the approved plans and applicable project requirements.