Your inspector needs to see the underground plumbing layout, fittings, slope, support conditions and required test before the work is covered by backfill or concrete.
Start with wide views so the inspector understands the complete underground layout, then get closer to fittings, slope, cleanouts, penetrations, bedding and test conditions.
Keep the piping, fittings, connections, support conditions and required test visible until the inspection evidence is complete.
Use a measuring tape for depth, spacing, clearances and other dimensions. Use a level when pipe slope or pitch needs to be verified. Make sure the measuring tool and piping are both clearly visible.
Start with a slow video showing all underground plumbing included in the inspection.
Make sure we can see:
Take clear photos of representative piping, fittings and connections before they are concealed.
Make sure we can see:
Show representative horizontal drainage runs clearly enough for the inspector to review the direction and pitch.
If slope or pitch needs to be verified, place a level on the pipe and take a clear photo or video showing the level and pipe together.
Make sure we can identify:
If the inspector needs to verify burial depth, spacing, separation or another dimension, show the measurement before the trench is covered.
Place a measuring tape next to the condition being measured and make sure the measurement is easy to read.
This may include:
Show how the underground piping is supported before backfill or concrete is placed.
Make sure we can see:
Show the underground plumbing components that will remain accessible or pass through the foundation or slab.
Make sure we can see:
Show enough surrounding area so the inspector can identify where each component is located.
If a test is required, show the complete test setup before the underground system is covered.
Make sure we can see:
Keep the required test in place for the inspection when applicable.
If part of the underground plumbing is different from the typical installation, make sure your inspector can clearly see it before the work is covered.
This may include:
Show the full area first, then take close-up photos of the condition.
Take 30 seconds and make sure your inspector can clearly see the underground plumbing before it is covered.
Submit your photos, videos, measurements, level evidence and test evidence through Permit Rockstar. Your inspector will compare the underground plumbing installation with the approved plans and applicable project requirements.