Home Additions and ADUs
Typical one-off price.
Typical price for an addition or ADU of 501 to 1,250 SF. Your quote may be higher or lower.
Second story adds $450. Larger and smaller additions are priced by size.
One upfront price
Once we quote it, that’s your price. No fees added later, no change orders.
Included with our upfront pricing
Need fewer services, or a custom package? Talk to us
Licensed contractor? You pay less. Verify your license to see your contractor rates and get instant quotes on some project types. Repeat and volume contractors save even more.
One price. No nickel-and-diming.
A Private Provider package for qualifying residential additions and Accessory Dwelling Units: plan review, permit submission, building and MEP inspections and closeout.
Government permit and impact fees are separate.
Pick a Time
Tell us about the addition or ADU. You will leave the call knowing the permit path, the price and what we need from you. Useful answers in the first 15 minutes; the calendar holds 30 in case you want to go deeper.
If the calendar does not appear, open the scheduling page or call 904-656-7068.
Sound Familiar?
Additions and ADUs often wait the longest in city review, and the client keeps asking for a start date.
Footings, framing, MEP rough-ins and finals. Every missed window pushes the whole job.
On a project with this many inspections, reinspection and no-show charges add up.
How It Works
Send the job once. We handle plan review, submission, inspections and closeout.
Share the address, scope and plans once. We tell you what is missing.
Private Provider plan review with clear comments, completed in 5 business days or we refund the plan-review portion.
We coordinate the submission so the building department can issue the permit.
Call in covered inspections when the work is ready. No booking days ahead.
We coordinate results and completion documents so the permit gets closed.
ADU Rules
Thinking about a backyard cottage, garage apartment or in-law suite? Here is what the state and local codes say, so you can plan the right unit for the lot.
Florida Statute 163.31771 says a city or county may allow ADUs in single-family zones. It does not require them, so each jurisdiction writes its own rules.
Bills in 2025 and 2026 (SB 184, SB 48 and HB 313) would have required ADUs by right. None of them passed.
Zones, size caps, owner-occupancy and rental rules change from one city line to the next. Check the local code first, then design.
| Jurisdiction | Allowed / zones | Approval | Max size | Owner / homestead | Renting | Placement and extras |
|---|---|---|---|---|---|---|
| Jacksonville / DuvalOrd. Code 656.403(g) | Yes. Attached or detached, accessory to a conforming single-family home in residential land use categories. | By right with a building permit | Footprint up to 25% of the main home or 750 sq ft, whichever is less | Homestead exemption on the lot (or applied for) | Varies, confirm with the AHJ | Behind the main home, not in a required yard. Design matches the main home. |
| St. Johns County (unincorporated)LDC 2.02.04.B.16 | Yes, as an Accessory Family Unit in residential and Open Rural zones | Administrative review | 35% of the main home or 2,000 sq ft, whichever is less; 800 sq ft always allowed | For family members; main home stays homesteaded | Not rented or sold separately | Same required yards as the main home |
| City of St. AugustineCode Ch. 28 | Yes, as an accessory apartment in RG-1, RG-2, RL-1 and HP-1 | Permitted use; historic review may apply | Under 800 sq ft or 25% of the main home, whichever is less | Owner-occupied | HP-1: monthly or longer. Elsewhere: Varies, confirm with the AHJ | Not in a required yard |
| Clay County (unincorporated)County ADU page | Yes, in listed districts | Conditional Use Permit | Varies, confirm with the AHJ | Varies, confirm with the AHJ | Varies, confirm with the AHJ | Varies, confirm with the AHJ |
| Nassau County (unincorporated)LDC 28.15(K) | Yes, in all residential districts that allow single-family homes; one per parcel | By right with a building permit | 50% of the home (garage excluded), up to 800 sq ft | Main home must be homesteaded if the ADU is rented | Allowed with homestead. Short-term: Varies, confirm with the AHJ | 1 extra parking space. Max 25 ft. Detached: 6 ft from lines, not in the front yard. |
| City of Fernandina BeachLDC 5.01.04 | Yes, one detached ADU per lot in listed residential, Old Town and some mixed-use districts | Permitted accessory use | 625 sq ft | Homestead required to rent | Long-term only (31+ days), with homestead | Behind the front facade. Max 25 ft. |
| City of Jacksonville BeachLDC 34-558(a) | RM-1 and RM-2 only, not RS districts | Conditional use | 350 to 500 sq ft; 5,000 sq ft minimum lot | Main home owner-occupied (notarized affidavit) | Varies, confirm with the AHJ | 1 space for the ADU plus 2 for the home. Max 15 ft. Shared meters. |
| City of Atlantic BeachCity zoning brochure | Garage apartment only, on lots 50+ ft wide running street to street | Varies, confirm with the AHJ | Garage and apartment up to 75% of the main home heated area | Varies, confirm with the AHJ | Leases of 90 days or more | Max 25 ft. 20 ft from the main home. |
| Town of Orange ParkTown Code | Comprehensive plan permits guest houses and garage apartments in low and medium density residential | Varies, confirm with the AHJ | Varies, confirm with the AHJ | Varies, confirm with the AHJ | Varies, confirm with the AHJ | Varies, confirm with the AHJ |
| City of Neptune BeachPlanning and Zoning | Varies, confirm with the AHJ | Varies, confirm with the AHJ | Varies, confirm with the AHJ | Varies, confirm with the AHJ | Varies, confirm with the AHJ | Varies, confirm with the AHJ |
Rules change, so we confirm the current requirements with your AHJ before your plans go in.
Sources: Fla. Stat. 163.31771 · SB 184 (2025) · SB 48 (2026) · HB 313 (2026) · local codes linked in the table · HUD FY2026 FMRs · Fannie Mae SEL-2025-08 · Pew Research Center. Jurisdiction data as of Nov 11, 2026.
Planning an Addition
Expect to submit a survey showing setbacks and lot coverage. Accessory buildings count toward impervious surface in places like Fernandina Beach and Neptune Beach.
Plans show Florida Building Code compliance, with energy calculations, truss engineering and a product approval list. St. Augustine, for example, asks for all of them on an addition.
If an addition costs 50% or more of the home's market value, FEMA's substantial improvement rule can bring the whole home up to current flood standards. Historic districts may need design review first.
Sources: St. Augustine Building Permit Information · Fernandina Beach LDC · FEMA substantial improvement.
Plan Review Guarantee
Plan review is completed in 5 business days or we refund the plan-review portion. Many reviews take 2 business days or less.
The guarantee covers completing the review with an approval or a revision request. The building department still issues the permit.
Florida Coverage
Every city and county has its own rules. We are registered as a private provider with jurisdictions across Florida, and the number keeps growing.
Source: public AHJ tracker (Registered status).
Permit Rockstar is a truly professional operation. I relied on Permit Rockstar for permit processing, plan check coordination, inspections, the notice of commencement, process questions, and private provider work, and the results were excellent. Highlights included prompt turnaround, cost savings, an easy online experience, an approachable team, taking on the city process, and transparent communication. I would like to recognize Karen, Fabian, Matthew, and Juan for their help. I saved weeks relative to managing it myself. I felt in good hands throughout. I will engage them earlier on future projects. Permit Rockstar has my full endorsement.
I had such a great experience with Permit Rockstar. I turned to Permit Rockstar for the permit for my project, the plan review process, the inspection process, the NOC and forms, and permitting questions, and it was a great decision. Here's what stood out: I was impressed by how quickly it got done, I always knew where things stood, and the city side was taken care of. Everyone I worked with was a pleasure and I could do it all online. I could finally relax about the process. I trusted them completely. I wish I had come to them first. There were no surprises along the way. I got weeks of my life back. Alex kept me in the loop from start to finish. Karen got back to me right away, kept me in the loop, and dealt with the city for me. Thanks again, Permit Rockstar, you've earned a loyal customer.
Permit Rockstar took care of my permit, the plan check, and my inspections for me. Clear updates. Helpful, friendly staff. Great hands to be in. Only regret: not finding them sooner. Karen kept me informed, was warm and kind, and really knew the codes. Matthew was quick to respond, kept me informed, and was a joy to work with. Renee got back to me right away and was warm and kind. Recommend them to every contractor.
Permit Rockstar handled the permit and inspections on this job. Turnaround speed, how easy the online process was, communication, and the friendly team stood out. That saved us weeks. It felt like we were in good hands. Fabian replied quickly, was friendly, and knew the codes.
Permit Rockstar was used for the permit and inspections. What stood out was turnaround speed and that they saved money. That saved us days.
They helped with the permit, plan review, and inspections. Karen and the team are excellent at strategic thinking and communicating. They find a way through any obstacle while being strategic and persistent.
They helped with inspections. Turnaround speed and communication stood out. The process was stress-free. The response time is always fast. Karen replied quickly and kept us updated.
Professional and prompt. Will be using this company for years to come!! Permit Rockstar was used for private provider support, the permit, and plan review.
We use you for inspections only so I know how to request but as far as the process; your team was very helpful and available to teach me the process. Even just to apply the NTBO to the county.
Straight Answers
Private Provider plan review, permit submission coordination, eligible Building, Mechanical, Electrical and Plumbing inspections and permit closeout support for qualifying residential additions and ADUs.
Plan review is completed in 5 business days or we refund the plan-review portion. Many reviews take 2 business days or less.
No. Covered reinspections and missed appointments do not cost extra. There is no subscription and no per-inspection meter.
Yes. Florida's private provider law (s. 553.791) lets a licensed private provider handle plan review and inspections. The local building department still issues the permit.
We are registered in 320 AHJs in Florida. Check the coverage map or ask during your consultation.
The prices shown are typical one-off project prices. Licensed contractors pay less with contractor rates, and repeat and volume contractors save even more. Verify your license to see your contractor rates and get instant quotes on some project types. See licensed contractor rates.
No. Florida Statute 163.31771 lets each city and county decide whether to allow ADUs, and bills in 2025 and 2026 that would have required them by right did not pass. Your local code sets the rules.
Usually yes, on a conforming single-family lot with a homestead exemption (or one applied for). The ADU sits behind the home and outside required yards, with a footprint up to 25% of the main home or 750 sq ft, whichever is less. Jacksonville Beach and Atlantic Beach have their own rules.
It depends on the jurisdiction: 750 sq ft in Jacksonville (or 25% of the home), 800 sq ft in Nassau County (or 50%), 625 sq ft in Fernandina Beach, 350 to 500 sq ft in Jacksonville Beach, under 800 sq ft in St. Augustine (or 25%), and up to 35% of the home or 2,000 sq ft in St. Johns County, with 800 sq ft always allowed.
It depends on where you build. Nassau County allows it when the main home is homesteaded. Fernandina Beach allows 31+ day rentals with homestead. Atlantic Beach garage apartments need 90+ day leases. St. Johns County family units are not rented. Ask us and we will confirm the rule for your address.
In much of Northeast Florida, yes. Jacksonville, Jacksonville Beach, St. Augustine and St. Johns County tie ADUs to an owner-occupied or homesteaded main home. Nassau County and Fernandina Beach require homestead when the unit is rented.
Yes. City or county approval does not cancel HOA rules or deed restrictions. Get the HOA approval in writing before design. Jacksonville asks you to confirm your HOA allows an ADU on the permit application.
Yes. An ADU is a dwelling, so it needs a building permit and inspections under the Florida Building Code. Some places add a zoning step first, such as a conditional use in Jacksonville Beach or a Conditional Use Permit in Clay County. Our package covers Private Provider plan review and eligible inspections.
Get Your Next Addition Moving
Tell us about the project. In 15 minutes you will know the permit path, the price and what we need from you.
One-off project rates are from our published Pricing page for qualifying projects. Government permit and impact fees are separate.